Skip to content

Offshore Wind O&M Call

Open call · Hosted by Meridian Energy. The offshore fleet is growing faster than our vessel days, so every crew transfer has to earn its weather window.

OpenOpen call Host: Meridian Energy Type: Open call Region: Oslo Reward: EUR 150k pilot + vessel days Closes Oct 2 · 60 days left 66 participants joined

About this open call

What this event is about

Offshore maintenance runs on weather windows, and too many trips end with a technician on the platform holding the wrong part or no diagnosis at all. We want the fault named and specified before a vessel is booked.

What we are looking for

Companies with a deployed condition-monitoring, robotic inspection or maintenance-planning product that works from existing SCADA and vibration records on turbines that keep turning.

Problem statements

Trips that end without a fix

A crew transfer spends a weather window whether or not the fault is repaired. Too often the component is identified on the platform rather than on shore.

Blade inspection without a stop

Rope access means a stopped turbine and a booked team, so inspections wait for the schedule rather than the crack. We want defects found and sized while the machine is turning.

Warning time on main bearings

Our alarm thresholds tell us a main bearing is failing at about the point it fails. Six weeks of notice would move that work into a planned window with the jack-up already contracted.

Evaluation criteria

How entries are scored

100% weighted total

Innovation & originality25%
Feasibility25%
Strategic fit20%
Impact potential20%
Team & execution10%

Timeline

  1. Jul 8, 2026

    Brief and data released

    The maintenance brief went out with two years of downtime figures by component.

  2. Jul 20, 2026

    Entries open

    Technical questions go to the offshore asset team while entries are open.

  3. Oct 16, 2026

    Shortlist and base visit

    Shortlisted teams visit the operations base and read a full season's maintenance schedule.

  4. Nov 6, 2026

    Pilot decision

    Selected teams get vessel days and one turbine string to work on from spring.

Sponsors & partners

Meridian Energy

Host

Lead

Plug and Play

Programme partner

Supporting

FAQs

Do we get access to a turbine?

Shortlisted teams get a base visit; pilot teams get vessel days and one turbine string to instrument. Anything fixed to the tower or the nacelle clears our own approval process first.

Which data is available to entrants?

Two years of ten-minute operational data, vibration records from the monitoring system already installed, and the work-order history behind every unplanned stop.

We have only worked onshore. Is that a problem?

No, if your rotating-machinery or inspection record is real and you say plainly what changes offshore. Safety training, vessel logistics and permits are ours to arrange.

Take part

Submit your entry before the deadline. Every entry is scored against the criteria above.